Reference
Hydroelectric Power Plants:
|
Client: |
Elektroprivreda BiH |
|
|
HPP Grabovica-observation of dam, soil in the area of dam and water storage during total empty |
|
Implementation period: |
2005 |
|
Client: |
Elektroprivreda BiH |
|
|
Drawing up of survey of results of dam observation HPP Jablanica, HPP Grabovica and HPP Salakovac |
|
Implementation period: |
2005 |
|
Client: |
JP VODNO PODRUČJE |
|
|
Geotechnical works and investigations for the purposes of cause identification of leaking and settlement of earthfill dams Hazna and Vidara |
|
Implementation period: |
2005 |
|
Client: |
INTRADE D.O.O. and INTRADE ENERGIJA D.O.O. Sarajevo |
|
|
Study of alternative solutions of hydroenergetic utilization of upper water course of the river Neretva upstream from settlement Glavatičevo |
|
Implementation period: |
2009 - 2010 |
|
Client: |
JP VODNO PODRUČJE |
|
|
Annex with contract - Geotechnical works and investigations for the purposes of cause identification of leaking and settlement of earthfill dams Hazna and Vidara |
|
Implementation period: |
2006 - 2007 |
|
Client: |
Elektroprivreda B&H |
|
|
HPP Vranduk preparation activities for construction |
|
Implementation period: |
2006 - 2007 |
|
Client: |
Agencija za vodno podr. Slivova rijeke Save |
|
|
Dam Hazna and Vidra- Technical observatioon |
|
Implementation period: |
2009 - 2010 |
|
Client: |
Electricity Company of Bosnia & Herzegovina |
|
|
HPP Jablanica – Optimization of hydraulich parametar |
|
Implementation period: |
2009 - 2010 |
|
Client: |
Electricity Company of Bosnia & Herzegovina |
|
|
HPP Una Kostela- Study: Analysis of hydraulic properties and enrgy indicators |
|
Implementation period: |
2010 - 2011 |
Thermal Power Plants:
|
Client: |
TPP Tuzla |
|
|
Design of part of automation for unit 4 |
|
Implementation period: |
2001 |
|
Client: |
TPP Tuzla |
|
|
|
|
Implementation period: |
2002 |
|
Client: |
TPP Tuzla |
|
|
Construction investment programs for Lukavac/Živinice |
|
Implementation period: |
2002 |
|
Client: |
TPP Tuzla |
|
|
Testing and Commissioning |
|
Implementation period: |
2002 |
|
Client: |
SIEMENS, Sarajevo |
|
|
Installation and commissioning |
|
Implementation period: |
2003 |
|
Client: |
SIEMENS, Sarajevo |
|
|
Support in designing and realization of projects |
|
Implementation period: |
2003 |
|
Client: |
Elektroprivreda B&H |
|
|
Designing, delivery, installation, testing and commissioning in TPP Kakanj |
|
Implementation period: |
2003 |
|
Client: |
Electricity Company of Bosnia & Herzegovina |
|
|
Reconstruction of existing TPP Kakanj units in order to get heat capacity of 600 MW. Construction of heat station and distributive lines from Kakanj for the purpose of district heating. |
|
Implementation period: |
2002 - 2004 |
|
Client: |
BH ATM, Mostar |
|
|
Supervision on installation in |
|
Implementation period: |
2004 - 2005 |
|
Client: |
IBE - Kakanj |
|
|
Design for analysis of CO2 in TPP Kakanj |
|
Implementation period: |
2005 |
|
Client: |
SIEMENS, Sarajevo |
|
|
Commissioning in TPP Kakanj |
|
Implementation period: |
2005 |
|
Client: |
BH ATM, Mostar |
|
|
Supervision in |
|
Implementation period: |
2005 |
|
Client: |
KEK |
|
|
Designing, delivery of equipment and commissioning in TPP Kosovo B |
|
Implementation period: |
2004 - 2006 |
|
Client: |
Electricity Company of Bosnia & Herzegovina |
|
|
Reconstruction of inverter battery in the TPP Kakanj |
|
Implementation period: |
2007 - 2008 |
|
Client: |
Electricity Company of Bosnia & Herzegovina |
|
|
Preparation of maintenance manual for unit 5 and 7 in TPP Kakanj |
|
Implementation period: |
2007 - 2008 |
|
Client: |
Electricity Company of Bosnia & Herzegovina |
|
|
Project of heating GPO blocks 5 and 6 TTP Kakanj |
|
Implementation period: |
2009 |
|
Client: |
Electricity Company of Serbia (EPS) |
|
|
The project to reduce water consumption |
|
Implementation period: |
2007-2010 |
|
Client: |
Electricity Company of Bosnia & Herzegovina |
|
|
Repair mechanical and electrical equipment of cooling towers block |
|
Implementation period: |
2009-2011 |
Installations for the use of Wind Power/ Windmills Offer is made for Electricity Company of Bosnia and Herzegovina for the design and construction of wind farms Podveležje – Tender is cancelled and we expect renewal of the invitation to tender. Small Hydro Power Plants
|
Client: |
JP VODNO PODRUČJE SLIVA RIJEKE SAVE BOSNIA & HERZEGOVINA |
|
|
Main design of reconstruction of protective hydraulic plant of earth-bank of the river Sava and Bosna in the area of Odžačka Posavina-II phase |
|
Implementation period: |
2006 |