Reference
- Silos for Ash
- Facility for pumps and mixers
Industrial objects
|
Client: |
MKS (FDS) |
|
|
Realization technical protection of object (perimeter,video,sensor cable and barriers) |
|
Implementation period: |
2006 |
|
Client: |
RMU Kakanj |
|
|
Delivery of equpment, mounting |
|
Implementation period: |
2006 |
|
Client: |
Elektroprivreda Srbije (EPS) |
|
|
|
|
Implementation period: |
2007 - 2010 |
Buildings and structures for electric power projects
|
Client: |
Elektroprivreda Srbije (EPS) |
|
|
|
|
Implementation period: |
2007-2010 |
Public services and facilities
|
Client: |
PTT SARAJEVO |
|
|
Adaptation of the main postal center |
|
Implementation period: |
2000 - 2001 |
|
Client: |
UNITIC Sarajevo |
|
|
|
|
Implementation period: |
2001 - 2004 |
|
Client: |
Government of FB&H |
|
|
|
|
Implementation period: |
2002 |
|
Client: |
KANTON SARAJEVO |
|
|
Restoration of individual residental buildings |
|
Implementation period: |
2002 - 2004 |
|
Client: |
KANTON SARAJEVO |
|
|
Restoration of residental and business buildings |
|
Implementation period: |
2002 - 2004 |
|
Client: |
SUD ZA RATNE ZLOČINE |
|
|
Main project and supervision of construction works |
|
Implementation period: |
2004 |
|
Client: |
DIREKCIJA CESTA SARAJEVO |
|
|
Supervision of works during physical planning of businnes building of Directorate of roads |
|
Implementation period: |
2005 |
|
Client: |
BH TELECOM |
|
|
Main design of ATC Baščaršija and ATC Alipašino Polje |
|
Implementation period: |
2005 |
|
Client: |
High Judical and Prosecutorial Council |
|
|
Drawing up of Concept and Main design of reconstruction and renewal of building part of Municipal and Cantonal court in Sarajevo |
|
Implementation period: |
2006 |
|
Client: |
UNIVERSITY OF SARAJEVO |
|
|
Main design for agri-foostuffs faculty with in Campus of the Universtiy in Sarajevo with related infrastructure |
|
Implementation period: |
2007 - 2008 |
|
Client: |
MINISTRY OF COMMUNICATIONS AND TRANSPORT- Bosnia and Herzegovina Directorate of Civil Aviation |
|
|
Drawing up of design documentation for purposes of establishment of BH ATM system |
|
Implementation period: |
2007 - 2009 |
|
Client: |
Roughton International |
|
|
Preparation of the Feasibility study for M-17.3. Buna-Neum road, section Neum-Stolac |
|
Implementation period: |
2009 - 2010 |
|
Client: |
MINISTRY OF COMMUNICATIONS AND TRANSPORT |
|
|
Main project „Highway on the Vc LOT 4 Corridor“ |
|
Implementation period: |
2008 - 2011 |
|
Client: |
BH Telecom |
|
|
Working design of reconstruction, rehabilitation and heightening BH Telekom-Telekom Inženjering Building |
|
Implementation period: |
2011 |