Water Management Plants
|
Client: |
JP VODNO PODRUČJE SLIVA RIJEKE SAVE |
|
|
Main design of reconstruction of protective hydraulic plant of earth-bank of the river Sava and Bosna in the area of Odžačka Posavina-I phase |
|
Implementation period: |
2005 |
|
Client: |
Elektroprivreda BiH |
|
|
The utilization of hydroenergetic potential a river Boštica |
|
Implementation period: |
2009 |
|
Client: |
Elektroprivreda BiH |
|
|
The utilization of hydroenergetic potential a river Stupčanica |
|
Implementation period: |
2009 |
|
Client: |
AD Vodovod i kanalizacija |
|
|
Sewage system of town Bijeljina-Main design 2 Phase, 3 Stage |
|
Implementation period: |
2009 - 2010 |
Systems for Disposal of Ash
|
Client: |
TE Kosovo B |
|
|
Hydraulic transport of combustion products (fly and bottom ash) from TPP Kosovo B to mine open pits so as to reclaim devastated soil after exploitation of open pit coal mine. It will have great environment on protection of air and leaching water. |
|
Implementation period: |
2004-2006 |
|
Client: |
JP Elektroprivreda BIH |
|
|
Transport of fly ash from ESP (electrostatic precipitator) to the selling plant (silo+loading into trucks). Transport of fly ash from ESP to mixing facility and further on hydraulic transport of slurry to disposal site. |
|
Implementation period: |
2006 - 2008 |
|
Client: |
Elektroprivreda Srbije (EPS) |
|
|
|
|
Implementation period: |
2007-2010 |
Other Supporting Facilities
|
Client: |
TERMINAL OF LIQUID FUELS, SARAJEVO |
|
|
Quantitative and qualitative acceptance of equipment |
|
Implementation period: |
2000 - 2001 |
|
Client: |
Federal Ministry of Phisical Planning and Environment |
|
|
Jajce-reconstruction of river bed of Pliva and waterfall – II phase |
|
Implementation period: |
2005 |
|
Client: |
Petrolinvest Sarajevo- |
|
|
Service of design our designer |
|
Implementation period: |
2006 - 2007 |